Editor:
Thanks to the prompt efforts of the Director of Engineering Steven Lan and the work crews, the entire stretch of the Brunswick Point Dike Trail along with the adjacent River Road dike trail between 34th and 30B St., have been entirely repaired and resurfaced with proper aggregate and re-compacted resulting in them being once again useable for cyclist and strollers along with being much easier to walk and run on.
Special thanks to councillor and former Mayor Lois Jackson for her assistance and guidance helping to get this resolved.
Thank you City of Delta for your very prompt attention resolving this.
Even I am amazed how good this turned out!
Mr. A. J. Russell